Home >

Interpretation Of The Project Contract Book How To Draw Up

2014/3/15 10:08:00 38

ProjectContractContract Model

Entrustment: the first party is the first party.


The Contractor: the company is referred to as Party B (hereinafter referred to as Party B).


I. main requirements:


(1) the name of the project: the first, the second and the third.


(two) the installation site: the first, the second and the third.


(three) other contents:


(four) total budget cost:


(five) methods for providing technical information and drawings:


Two, production deadline:


The contents of this contract shall be completed from the beginning of the year of the year of the year, the date of the month, the date of design, and the completion of the month.


Three, the way of settlement:


1. on the date of signing the contract, Party A shall pay the gross cost of the Party B to the Party B in advance on the date of signing the contract, and the advance payment shall be paid in advance. The amount of the remaining amount will be settled at once within one day after the completion of the project. The quality of the gross sum will be settled after six months.


2. during the contract operation, the contents of the contract shall be increased. After Party A and Party B approve, Party A shall first increase the sum of 50% of the sum, and the balance 50% will be paid at once after acceptance.


Four. Construction, demolition and design changes:


1. Party B shall organize production according to the requirements and meet the qualified standards.


2. in the process of construction, Party A shall actively cooperate with Party B's on-site coordination work.


Five. Engineering inspection And warranty:


1. Party B will inform Party A within two days after the completion of the project. If the inspection fails to pass the inspection, Party B will pass the acceptance examination.


2. during the acceptance period, if the quality problems caused by Party A's responsibilities are found, and when the rework or repair suggestions are put forward, Party B will complete the work within the prescribed time limit and charge the corresponding work cost. If Party B causes quality problems, Party B will replace it free of charge.


3. the warranty period is 1 years (except for man-made and non exclusive natural disasters).


Six. Project leader and industrial accident:


1, Party A is appointed as the person in charge of the site, and the party responsible for the scene is responsible for the implementation of the provisions of this contract.


2, Party B should educate workers, strictly observe the operation procedures, do well in fire prevention and anti-theft work, and comply with the relevant provisions of the site, and the loss caused by industrial accidents in the construction shall be borne by Party B.


Seven, specify:


The power supply should be arranged within 1 meters of the product. Site installation location and other coordination requirements involving installation need to be settled by Party A.


Eight, others clause :


1. when examining and approving the design contents, the client carefully examines every detail of the project, approving and signing or approving the instructions. After confirmation, there is an error and the client shall bear all the responsibilities and all the contents.


2. after the signing of the contract, if there is a unilateral breach of contract, all the liabilities will be borne by the breaching party. If any party needs to change this contract or other special requirements, it shall be agreed upon by both parties. Another supplementary contract will be signed.


3. contract annex


1., it is the largest of the two.


2., it is the largest of the two.


Nine, dispute resolution:


In the execution of this contract, if there is a dispute, the two parties should try their best to settle the dispute through negotiation. If negotiation fails, either party may arbitrate or lodge a complaint with the arbitral body with jurisdiction.


1. contract annexes and supplementary contracts have the same legal effect as this contract.


2. books contract It will take effect once it is signed and sealed.


Party A: Party B:


Address: Address:


Contact number: contact number:


Sales Representative: Sales Representative:


Date of signing: date, month and date

  • Related reading

Analysis Of How To Make A Contract For Home Page Production

Contract template
|
2014/3/15 9:17:00
22

Analysis Of Regional Agent Sales Contract How To Draw Up

Contract template
|
2014/3/14 23:27:00
49

How To Design The Contract For Advertising Design And Production

Contract template
|
2014/3/14 23:24:00
25

How To Make A Contract For Website Production

Contract template
|
2014/3/14 22:50:00
28

Analysis Of Model Provisions For General Cargo Sales Contracts

Contract template
|
2014/3/14 22:33:00
22
Read the next article

Clothing Sales Require Planned Customer Management.

To do a good job in clothing sales, we must first do a good job in clothing sales management. Many enterprises have poor sales performance, such as the poor sales of clothing products, a large number of accounts receivable, the enthusiasm of clothing salesmen, the high cost of clothing sales, and so on. It is not because of the incorrect clothing sales strategy and the reluctance of salesmen to make efforts, but because of the fact that the sales management of clothing sales is not in place.